Increase your productivity when working between Autodesk® Revit® and Autodesk Navisworks applications.
Transition between views in both applications for easy navigation and visualization with the Switchback feature.
Pass construction components created with new Revit® Construction Modeling tools into Navisworks project review software for 4D simulation.
More accurately create 4D sequences to demonstrate constructability with support for Revit properties, including areas, volumes, and points, along with Revit-linked files and split regions.
Open, review, and explore your 2D data sets alongside your 3D models. Select a model component in the 3D world, then find and review the same component in a 2D representation.
The review toolkit offers a host of tools that facilitate whole-project review.
Measure distances, areas, and angles.
Store, organize, and share camera views of a design and export them into images or reports.
Add cross sections and section plans to inspect details closely.
Use NWF reference files to view the latest version of a CAD design while maintaining previous review data.
Open current model and viewpoint in many original design software packages.
Automate tasks or extend functionality using extensive APIs (application programming interface).
The review toolkit is available in Autodesk® Navisworks® Manage software and Autodesk® Navisworks® Simulate software. Measure Tools are also available in Navisworks Freedom.
Simulate construction schedules and logistics in 4D to visually communicate and analyze project activities, and to help reduce delays and sequencing problems.
Verify building or demolition viability by developing construction or demolition sequences that link model geometry to times and dates.
Import times, dates, and other task data from project management software to dynamically link schedules with project models.
Set up planned and actual times to visualize deviations from the project schedule.
Export 4D simulations as AVI animations or sequential images.
Customize simulation behavior and overlay text.
Use CSV Import/Export for two-way interoperability with other applications.
Copy and paste dates from spreadsheets and specialist planning tools.
Use tools to associate geometry and tasks quickly and easily.
4D scheduling capabilities are available in Autodesk Navisworks Manage software and Autodesk Navisworks Simulate software.
Explore your integrated project model using advanced navigation tools.
Enable gravity, solid-object recognition, and customizable third-person avatars for a realistic, real-time experience.
Use comprehensive navigation tools, including Walk, Look Around, Zoom, Zoom Box, Pan, Orbit, Examine, Fly, and Turntable.
Access the Autodesk® ViewCube® and Autodesk® SteeringWheels® 3D navigation widgets and the navigation bar for a consistent user experience across Autodesk® applications.
Real-time navigation capabilities are available in Autodesk Navisworks Manage software, Autodesk Navisworks Simulate software, and Autodesk Navisworks Freedom software.
Extend the whole-project view to all project stakeholders, improving communication and collaboration.
View all simulations and output saved in 3D DWF™ and NWD formats.
See model hierarchy, object properties, and embedded review data, including viewpoints, animations, redlines, and comments.
Whole-team review capabilities are available in Autodesk Navisworks Manage software, Autodesk Navisworks Simulate software, and Autodesk Navisworks Freedom software.
Microsoft® Windows® 7 Enterprise, Ultimate, Professional, Home Premium, or Home Basic edition, Microsoft® Windows Vista® Enterprise, Ultimate, Business, Home Premium, or Home Basic edition (SP2 or later), or Microsoft® Windows XP Professional Home 32-bit (SP2 or later) or Professional x64 edition (SP3 or later)
AMD Athlon™ processor, 3.0 GHz or faster, or Intel® Pentium® 4, 3.0 GHz or faster (recommended)
512 MB RAM (2 GB or greater recommended)
1 GB free disk space for installation
1,024 x 768 VGA display with true color (1,280 x 1,024 monitor and 32-bit video display adapter recommended)